- cross-posted to:
- [email protected]
- cross-posted to:
- [email protected]
[T]he report’s executive summary certainly gets to the heart of their findings.
“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”
https://en.wikipedia.org/wiki/Chernobyl_disaster
Yeah, read it. Also the article with the discussion on the death toll. 31 immediate deaths 60 attributable in the following two decades
The official WHO estimate with 4000 more cancer deaths until 2050 is based on the disputed LNT model. Even UNSCEAR itself says:
https://www.smh.com.au/national/let-s-separate-the-urban-myths-from-chernobyl-s-scientific-facts-20190705-p524f7.html
https://www.theguardian.com/commentisfree/2011/apr/05/anti-nuclear-lobby-misled-world
The two airship accidents with the most casualties count together 120 dead (USS Akron and Dixmude).