Today’s gonna be prepwork for the remainder of the project we built the last two buildings for. That means more tubeway.

What’s left on this project is a lot more convoluted than just dropping down like 80 Refineries, so I had to spend some time brainstorming and measuring layouts.

With a rough layout in mind, and measurements of how much space I THINK that’ll need, it was time for building footprints. I decided to go with 2 separate buildings.

Since I needed to wait on concrete a bit to fully build out the foundations for those buildings, I went ahead and rebuilt that section of tubeway that I needed to raise up by 4 meters.

Then I finished the foundations and the rest of the new tubeway.